EPCM Waste Water Project
Mindanao, Philippines
Mindanao, Philippines
Finn Biogas was contracted to complete a turnkey waste water plant to a client in the Philippines. The client operated large scale chicken farming and meat production, which produced a large amount of waste water from operations.
The project involved a complete turnkey project and involved the following stages
The project spanned over 18 months from project conception to commissioning.
One of the products of the waste water was used as feedstock into the biogas plant which Finn Biogas also built for the same client.
Location: Mindanao, Philippines
Project Length: 6 months
Waste Stream: Chicken meat production
Waste Water Project Size: 900 cubic metres / day